HOME  »  Pool Construction » 3-plumbing  (10 Slides)     [Page 1 of 1] :: Jump To  

The plumbers came the next day, August 12 and did almost all of the plumbing. They came back on the 13th and did some leak testing.

The hole is done, and the plumbers show up the next morning. * The hole is done, and the plumbers show up the next morning. * 2048 x 1536 * (2.09MB)
Lots of PVC pipes. * Lots of PVC pipes. * 2048 x 1536 * (2.24MB)
Getting started.
 * Getting started.
 * 1536 x 2048 * (1.99MB)
The finished plumbing. * The finished plumbing. * 2048 x 1536 * (2.19MB)
  IMG_0853  
  IMG_0854  
  IMG_0855  
  IMG_0858  
Me in the deep end by the skimmer. * Me in the deep end by the skimmer. * 2048 x 1536 * (1.93MB)
Going to the shallow end. * Going to the shallow end. * 2048 x 1536 * (2.01MB)
I won't be under water at the shallow end. * I won't be under water at the shallow end. * 2048 x 1536 * (1.89MB)
Looking at the filter. * Looking at the filter. * 2048 x 1536 * (2.03MB)
  IMG_0859  
  IMG_0860  
  IMG_0861  
  IMG_0862  
The whole pool. * The whole pool. * 2048 x 1536 * (2.08MB)
Another angle. * Another angle. * 2048 x 1536 * (2.13MB)
  IMG_0863  
  IMG_0864  
  Up one level  
Album last updated on 9/8/08 12:18 PM
Powered by JAlbum 7.1 and BluPlusPlus skin