HOME  »  Pool Construction » 2-excavate  (14 Slides)     [Page 1 of 1] :: Jump To  

The excavators came on August 11. They worked from about 6:30 am until 3:30 pm on digging the hole. That's a big hole!

Start digging! * Start digging! * 2048 x 1536 * (2.06MB)
Big equipment! * Big equipment! * 2048 x 1536 * (1.8MB)
The hole is taking shape! * The hole is taking shape! * 2048 x 1536 * (2.24MB)
Cutting out the benches. * Cutting out the benches. * 2048 x 1536 * (2.59MB)
  IMG_0838  
  IMG_0839  
  IMG_0840  
  IMG_0841  
That's a big hole! * That's a big hole! * 2048 x 1536 * (2.16MB)
More digging. * More digging. * 2048 x 1536 * (2.36MB)
Keep going. * Keep going. * 2048 x 1536 * (2.19MB)
Getting to the back of the pool. * Getting to the back of the pool. * 2048 x 1536 * (2.23MB)
  IMG_0842  
  IMG_0843  
  IMG_0844  
  IMG_0845  
Another bench on the right. * Another bench on the right. * 2048 x 1536 * (2.14MB)
Lots of dirt! * Lots of dirt! * 2048 x 1536 * (2.15MB)
Smooting out the bottom. * Smooting out the bottom. * 2048 x 1536 * (2.05MB)
Bobcat in the background to carry away the dirt. * Bobcat in the background to carry away the dirt. * 2048 x 1536 * (1.86MB)
  IMG_0846  
  IMG_0847  
  IMG_0848  
  IMG_0849  
Digging the deep end. * Digging the deep end. * 2048 x 1536 * (2.01MB)
More in the deep end. * More in the deep end. * 2048 x 1536 * (2.0MB)
  IMG_0850  
  IMG_0851  
  Up one level  
Album last updated on 9/8/08 12:18 PM
Powered by JAlbum 7.1 and BluPlusPlus skin